What I build

Your store, from rented to owned

I move your store from a monthly-fee platform to one you own. The catalogue, photos, page addresses and statistics move with it. You pay for development once and stop paying fees.

fixed quote + VAT

Who it's for

  • Your catalogue has grown and the fee grows with it.
  • You pay extra for features that should come as standard.
  • You want the website, the code and the data to be yours.
  • Your current store is slow and you don't know why.
  1. Audit and transfer

    I review the current store and move the catalogue, photos and text. I prepare the redirects.

  2. Side-by-side testing

    You check the new store on a temporary address while the old one keeps selling.

  3. Domain switch

    I switch the domain without taking the site or your email offline for a single minute.

  4. Ongoing support

    You manage prices and stock in the panel. I watch over the site and add what's needed.

What you don't lose

I keep page addresses or set up permanent redirects from the old ones, and keep the same analytics. Rankings and history move with the store. I've done this with stores of 274, 580 and 677 products. One of them needed 736 redirects.

When it isn't worth it

If your store is small and the fee is low, it may not pay off. I'll show you the numbers before we start: what you pay now, what your own store would cost and how long it takes to pay for itself.

What's included

  • Transfer of catalogue, photos, text and customers
  • Permanent redirects from old addresses
  • Same analytics, no lost history
  • Photos converted to lightweight formats
  • AI descriptions for products that have none
  • Domain switch with no downtime for site or email

Price

fixed quote

+ VAT

  • Set after the audit (€290, deducted from the project).
  • If you also want a new design, it's priced as an online store: from €3,900.

Questions

How long does the move take?

It depends on the catalogue. We moved a fashion store with 677 products and 37 brands in a few days. You get a fixed date after the audit.

Does the store go offline during the switch?

No. The new store is tested side by side and the domain is switched when everything is ready. Site and email stay up.

Tell me about your project

I reply within 24 hours with an honest first opinion: what I would do in your place, and whether you really need it.